After

One room renovation · Pool Area
Denistone East, NSW 2112
One room
Scope
19
Years Old (Pre-Reno)
2007
Year Completed
Areas Renovated
We installed our pool area in Denistone East, reworking a space we use every day. The pool area was completed around 19 years old and has been a great addition to our house. It was completed in 2007. In this breakdown we share exactly what the pool area cost, how long each stage took, the materials and trades we chose, and the things we would do differently if we were starting again.
Blue Haven Pools

Service Provider
Mario
Overall, I would rate Blue Haven Pools 4/5. The pool itself was completed well and the actual construction took around six weeks. However, there were a few issues with the advice and equipment provided. In particular, the original pool pump was not powerful enough and failed within the first 12 months. To their credit, Blue Haven eventually replaced this under warranty. I also would have appreciated better advice around pump positioning, filtration requirements and the sewer connection requirements before construction.
Adding solar heating
We decided to install solar heating for the pool, which has been one of the better additions we made. It allows us to keep the water warmer for longer periods without relying entirely on more expensive heating methods. This was particularly useful when the children were younger as they could use the pool more comfortably.
Upgrading the retaining wall
We upgraded the original timber edging to a proper retaining wall along the side of the pool. This helped retain the higher ground along the boundary, kept the pool surround more stable and level, and reduced soil and runoff coming onto the pool area. It was a relatively small upgrade that made the area feel much more permanent and practical.
Including steps and a 'beach' area
We included steps and a small 'beach' area inside the pool rather than having the pool immediately drop to full depth. This made getting in and out of the pool much easier and created a shallow area where people could sit. It was particularly useful when we had younger children using the pool.
Position the pump lower and closer to the pool
The biggest thing I would change is the location and specification of the pool pump. Our pump is positioned too far away and above the level of the pool, meaning it has to work harder to draw the water uphill. I would position the equipment closer to and lower relative to the pool and make sure the pump is powerful enough for the setup.
Install larger and better filtration equipment
I would also specify a larger cartridge filter and make sure all of the equipment is appropriately sized for the pool rather than simply accepting the standard package offered by the pool installation company. The original equipment felt like the minimum required and the pump failed within the first year. Spending slightly more upfront on appropriately sized equipment would likely have saved problems later.
Clarify the sewer connection before construction
I would confirm the council requirements for connecting the pool to the sewer before starting the build. We were initially told by the team at Blue Haven that using a cartridge filter meant a sewer connection would not be necessary, but council later wanted the pool connected to the household sewer in order to get approval. This created unnecessary difficulty during the approval process that could have been avoided with clearer advice upfront.
Consider a different internal pool finish (Tiles as opposed to Quartz finish)
I would look more closely at using tiles or another smoother internal finish rather than the Quartz-Style finish we selected. The finish provides good grip and reduces slipping, but it can feel quite rough against the skin when swimming or playing in the pool. This was particularly noticeable with children, so I would prioritise a smoother finish next time potentially tiles.